2-2-3 shift schedule: fixed and rotating versions

Compare the 14-day fixed version with the 28-day rotating version implemented by this generator. Both use four crew phases and continuous 12-hour Day/Night coverage.

Pattern 2-2-3-fixed@1

2-2-3 fixed · version 1

A 14-day fixed day/night pattern with two-on, two-off, three-on blocks.

Cycle length
14 days
Required crew phases
4
Average planned hours per crew per week
42 planned hours
Longest consecutive shift stretch
3 shifts
Longest break in the cycle
3 days
Day
7 shifts
Night
0 shifts

Implemented crew-phase matrix

Exact version 2-2-3-fixed@1 cycle. D is Day, N is Night, and O is Off.

CrewDay 11Day 22Day 33Day 44Day 55Day 66Day 77Day 88Day 99Day 1010Day 1111Day 1212Day 1313Day 1414
Phase 1DDOODDDOODDOOO
Phase 2OODDOOODDOODDD
Phase 3NNOONNNOONNOOO
Phase 4OONNOOONNOONNN

Pattern 2-2-3-rotating@1

2-2-3 rotating · version 1

A 28-day version that rotates each crew between day and night blocks.

Cycle length
28 days
Required crew phases
4
Average planned hours per crew per week
42 planned hours
Longest consecutive shift stretch
3 shifts
Longest break in the cycle
3 days
Day
7 shifts
Night
7 shifts

Implemented crew-phase matrix

Exact version 2-2-3-rotating@1 cycle. D is Day, N is Night, and O is Off.

CrewDay 11Day 22Day 33Day 44Day 55Day 66Day 77Day 88Day 99Day 1010Day 1111Day 1212Day 1313Day 1414Day 1515Day 1616Day 1717Day 1818Day 1919Day 2020Day 2121Day 2222Day 2323Day 2424Day 2525Day 2626Day 2727Day 2828
Phase 1DDOODDDOODDOOONNOONNNOONNOOO
Phase 2OODDOOODDOODDDOONNOOONNOONNN
Phase 3NNOONNNOONNOOODDOODDDOODDOOO
Phase 4OONNOOONNOONNNOODDOOODDOODDD

How this implementation behaves

In the fixed variant, two crews remain on Day and two remain on Night. In the rotating variant, the second half of the 28-day cycle exchanges those day/night roles.

Fixed and rotating 2-2-3 are different schedules

The 14-day fixed implementation keeps two phases on Day and two on Night. The 28-day rotating implementation uses the same first-half rhythm, then exchanges those Day and Night roles for the second 14 days before repeating.

Anchor the two-day block to a known roster date

In phase 1, cycle day 1 starts a two-day Day block. The fixed version repeats after 14 days; the rotating version starts the corresponding Night block on day 15. Use a date and crew assignment that you can confirm in an approved roster before treating the generated dates as aligned.

Common 2-2-3 setup errors

  • Treating the 2-2-3 or Panama name as a complete specification instead of checking the displayed D/N/O sequence.
  • Choosing the 14-day fixed version while expecting each crew to rotate between Day and Night.
  • Assigning local Crew A–D labels by display order without confirming which phase each crew follows on the anchor date.

Verify these items before operational use

  1. Align cycle day 1 with a known date from an approved source schedule; a wrong anchor shifts every assignment.
  2. Confirm that each real crew maps to the intended phase instead of assuming the displayed phase order matches local labels.
  3. Confirm the local Day and Night endpoints. Changing them can create real gaps, overlaps, or daylight-saving duration warnings.
  4. Review member exceptions, minimum rest, staffing targets, qualifications, leave, agreements, and local rules outside this template.

Implementation status and source boundary

Implemented versions
2-2-3-fixed@1, 2-2-3-rotating@1 in the site template registry
Internal content review
Aug 6, 2026
External review
Not completed

These matrices are the site's versioned 2-2-3 implementations. Automated checks verify cycle length, four crew phases, and one Day plus one Night crew per service date. They have not been approved as an external industry standard or validated against your workplace roster.